Tent halls in Romania

By the tent3d editorial team · Updated 5 October 2026 · 2 min read

What to check before you put up a tent hall in Romania: the building permit for provisional constructions, the snow and wind codes, VAT when you buy from an EU or a Turkish manufacturer, and delivery. Checked on 5 October 2026 against the sources listed at the end.

Permits

  • In Romania, provisional constructions need a building permit (autorizație de construire) under the same conditions as permanent ones. They are buildings with a limited lifetime, which the permit states (Law 50/1991, Annex 2).
  • The process starts with an urban planning certificate (certificat de urbanism) from the town hall or county council; it is one of the documents the permit application must include (art. 7).
  • For some provisional works, among them farm outbuildings of agricultural holdings outside built-up areas, the permit is issued on simplified technical documentation (art. 3(1)(h) and 3(2)).
  • Fire safety rules and distances to the plot boundary apply in every case. See also do tent halls need a building permit?

Snow and wind loads

  • Romania has its own design codes: CR 1-1-3/2012 for snow and CR 1-1-4/2012 for wind, harmonised with the Eurocodes. The loads depend on the location and altitude of the site.
  • The manufacturer's structural calculation must use the loads of your exact site; see snow and wind loads.

VAT and customs

  • The standard VAT rate in Romania is 21 % since 1 August 2025 (Law 141/2025; it was 19 % before).
  • From a manufacturer in another EU country: a business with a valid EU VAT number is usually invoiced without VAT and accounts for Romanian VAT itself (intra-Community acquisition). Ask your accountant how installation services are treated.
  • From a manufacturer in Türkiye: industrial goods in free circulation in Türkiye enter the EU without customs duties under the EU–Türkiye customs union, with an A.TR movement certificate. Import VAT is still due; a customs agent files the declaration.

Delivery and installation

  • A tent hall travels by truck as a kit: frame, covers, doors and fixings. The offer states the delivery terms (for example the Incoterms EXW or DAP) and the delivery time.
  • Installation by the manufacturer's crew is optional. The ground must be ready before delivery, with a slab or anchoring points; see anchoring.

Sources (checked 5 October 2026)

This page is general information, not legal or tax advice. Rules change and authorities apply them locally: check with the town hall and a licensed designer before you order.

Frequently asked questions

Does a temporary tent hall need a permit in Romania?

+

Yes. Provisional constructions are authorised under the same conditions as permanent ones, and the building permit states how long they may stay (Law 50/1991).

What is the first step?

+

An urban planning certificate (certificat de urbanism) from the town hall. It lists the approvals the building permit application needs.

What VAT applies?

+

21 % standard VAT since 1 August 2025. Imports from Türkiye pay import VAT but, as industrial goods in free circulation, no customs duty under the customs union.